src="/files/fa/news/es/Thumbnails/cd92f482-4815-4b2b-bffa-ad6e80fedad1_260_199.jpg' class='img_convert' title='DSME Builds 2 LNG Carriers' alt='DSME Builds 2 LNG Carriers'>
The contract, includes options for two additional vessels that if exercised would increase the contract by about 83 billion won, MANA correspondent reported.
The 295-meter-long, 46-meter-wide vessels will be built at Geoje Okpo shipyard for delivery starting in the second half of 2019.
According to the shipbuilder, the LNG carriers will run on natural gas as main fuel, and will be equipped with a high pressure gas injection engine (ME-GI) by Man Diesel and a partial re-liquefaction system (PRS).